APPLICATION FOR BUILDING PERMIT ALL YOU NEED TO KNOW ABOUT APPLICATION FOR BUILDING PERMIT:- d. Building Plans are charted on developers’ plot contained in the layout provided by the Ministry of Environment and Physical Development, while site Analysis Report are provided for sites outside approved layout. e. Building Plans are processed and approved in the absence of query. If queried, the plans are withdrawn for amendments before resubmission f. Public building, Commercial and Storey buildings above two floors are referred to headquarters. g. Plans are approved with or without condition. h. Approved plans are dispatched and collected from the office of submission by the depositor. 2.1 PENALTY: Penalty fees are charged when construction commenced before approval is given (60% of approval fees). 2.2 RENEWAL: The life span of an approved building plan is two Calendar years. The building plan approval will be considered for renewal or revalidation if construction of the building is not completed within this period (2 Years). 3.0 LODGING OF COMPLAINTS: Applicant can lodge their complaints to the Area Officer concerned or the General Manager of the Board. The Public is to note that the Town Planning and Development Board is not in charge of Land Administration and therefore does not confer land title. Hence, any development permit given will be withdrawn should any document/information supplied by you be found to be false or if such a withdrawal is in public interest. 4.0 PENALTIES FOR CONTRAVENTION: According to the Kogi State Town Planning and Development Board’s Edict No. 5 of 1991 and infact the Nigeria Urban and Regional Planning law Decree No. 88 of 1992, and amended in 1999, states no development shall be commenced by anybody, Government or its agencies without obtaining an approval from the relevant development control department. Any developer that contravenes this law and embarks on the construction of illegal structures is liable to be charged 60% of the approval fees, if the development is approvable or be demolished, among other possible sanctions. Demolition of any erected illegal structure will be at the expense of the owner or developer. 4.5 ISSUES THAT MAY DELAY THE PROCESSING OF BUILDING PLANS: a. Ensure that sites are not within the area of Government interest. b. Ensure that they submit the layout plans of the area where the plot is situated. c. Ensure that they maintain proper set-back from the road. d. Ensure that site are not under high tension, electricity line, on NNPC Pipe line or railway set-back. e. Make sure that registered Architect, registered Town Planner and registered Engineer signed the design as the case may be. 4.6 PROCEDURE FOR STREET NAMING: 1. Submission of application. 2. Inspection/investigation of claim of the applicant concerning:- a. Length of stay of the applicant on the street. b. His contribution to the development of the street and the community. c. The acceptance of the street name by the majority of the residents. 3. Site Report/Recommendation. 4. Final approval. |
| Achievements |
| Kogi state Policies |
| 12 Points Agenda |
| KGSG Financial Statements |
| Financial Statements 2009 |
| Financial Statements 2008 |
| Contact Us |